porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 2836 > < Procedures|Page 2834
Page 60
background image

1. Lay B+ line -5-.

2. Screw down B+ line -5- at box for B+ line -4-.

2.1. Insert B+ line into the box -Arrow A- and tighten with the fastening nut. - Tightening torque: 23 Nm (17 ft. lbs.)
2.2. Close box for B+ line on engine -Arrow B-.

3. Position starter lead for terminal 30 and secure with fastening nut. - Tightening torque: 18 Nm (13 ft. lbs.)

Fitting ground strap to engine

1. Fit engine ground strap -6-.

Procedures|Page 2836 > < Procedures|Page 2834