porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 4543 > < Procedures|Page 4541
Page 17
background image

Information 
-

Observe torque on residual pressure retaining valve.

11. Fit pressure line at residual pressure retaining valve -(arrow)- using insert part T10212. Note tightening torque.

12. Mount ball joint of tie rod on wheel carrier. Tighten lock nut to specified tightening torque.

13. Screw in plastic nuts -arrows- on wheel housing liner.

Procedures|Page 4543 > < Procedures|Page 4541