xA L4-1.5L (1NZ-FE) (2006)
b. Install the 2 screws.
c. Connect the connectors.
3. INSTALL ECM COVER
a. Attach the 2 claws to install the cover.
4. INSTALL AIR CONDITIONING AMPLIFIER ASSEMBLY
5. INSTALL LOWER INSTRUMENT PANEL ASSEMBLY
a. Install the instrument panel.
6. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
a. Install the instrument panel.
7. CONNECT LIQUID TUBE SUB-ASSEMBLY
a. Remove the vinyl tape attached to the liquid tube and condenser.
1. Lubricate 2 new O-rings with compressor oil and install them to the liquid tube.
Compressor oil: ND-OIL 8 or equivalent
2. Connect the liquid tube and piping clamp.