xD L4-1.8L (2ZR-FE) (2008)
(d) Install the front exhaust pipe assembly with the 2 compression springs and 2 bolts.
Torque: 43 Nm (438 kgf-cm, 32 ft-lbf)
(e) Check the exhaust pipe supports.
NOTE: Install the exhaust pipe support onto the pipe retaining support.
2. INSTALL FRONT FLOOR CENTER BRACE
(a) Install the front floor center brace with the 2 bolts.
Torque: 30 Nm (307 kgf-cm, 22 ft-lbf)
3. INSTALL EXHAUST TAIL PIPE BAFFLE SUB ASSEMBLY
(a) Align the keyway on a new exhaust tail pipe baffle sub assembly baffle with the protruding part of the exhaust tail pipe as shown in the
illustration.
(b) Using a plastic hammer, uniformly tap in the tail pipe baffle.
4. INSTALL EXHAUST TAIL PIPE ASSEMBLY
(a) Using vernier calipers, measure the free length of the compression spring.