scion Workshop Repair Guides

Scion Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2987 > < Initial Inspection and Diagnostic Overview|Page 2985
Page 62
background image

(a) Measure the resistance according to the value in the table below.
HINT: The resistance must be measured after the F47 P-CAN junction connector is disconnected.

Standard resistance:

NG -- CHECK CAN BUS LINES FOR SHORT CIRCUIT (COMBINATION METER ECU BRANCH WIRE)
OK -- REPLACE P-CAN J/C

7. CHECK CAN BUS LINES FOR SHORT CIRCUIT (D-CAN J/C - P-CAN J/C)

(a) Turn the ignition switch off.
(b) Disconnect the F46 D-CAN junction connector.
(c) Measure the resistance according to the value in the table below.
HINT: The resistance must be measured after the F47 P-CAN junction connector is disconnected.

Standard resistance:

NG -- REPAIR OR REPLACE CAN MAIN WIRE OR CONNECTOR (D-CAN J/C - P-CAN J/C (CAN-H, CAN-L))
OK -- Continue to next step.

8. CONNECT CONNECTOR

(a) Reconnect the P-CAN junction connector.

NEXT -- Continue to next step.

9. CHECK CAN BUS LINES FOR SHORT CIRCUIT (D-CAN J/C - ECM)

Initial Inspection and Diagnostic Overview|Page 2987 > < Initial Inspection and Diagnostic Overview|Page 2985