Workshop Manuals Factory service & repair SEAT
01 Technical data02 Engine assy, cylinder block, crankcase03 Enginecrankshaft group, pistons04 Engine cylinder head, valve gear05 Engine lubrication06 Engine cooling07 Fuel supply, gas operation08 Exhaust turbocharger, G-charger09 Fuel preparation system Diesel injection10 Mixture preparation system, electronic inj., Gas11 Exhaust system12 Starter-current supply-CC13 Ignition system, glow plug system14 Clutch, control15 Gearbox mechanics, operation, construction, diff.16 Gearbox, mechanics, gears, shafts, internal operation17 Automatic gearbox, control, assembly, housing18 Automatic gearbox, gears, control19 Final drive, differential, differential lock20 Front suspension, drive shafts21 Rear suspension, drive shaft22 Wheels, tyres. axle align23 ABS, ADR, TCS, EDL, ESP24 Brake, brake mechanics25 Brakes, hydraulics, regulator, servo26 Steering27 Body front28 Body centre, roof, frame29 Body, rear30 Bonnet, flaps, cab, central locking31 Front door, central locking32 Rear door, sliding door, wing doors, central locking33 Sliding roof34 Bumper35 Glazing/window mechanism36 Exterior equipment37 Interior equipment38 Passenger protection39 Trim, noise insulation40 Seat frames41 Seat padding, covers42 Air conditioner43 Infotainment44 Windscreen wipe/wash system45 Lights, lamps, switches outside46 Lights, lamps, switches inside, anti-theft system47 Wiring
SEAT Exeo (2008-2013)47 · Wiring
47 · Electrical

Battery monitor control unit J367: remove and install

Make
SEAT
Model
Exeo
Year
2008–2013
Section
Electrical system › Battery monitor control unit J367: remove and install
WiringBattery monitor control unit J367: remove and install

Battery monitor control unit J367: remove and install

Vehicle electrics · Electrical system · Battery monitor control unit J367: remove and install · Exeo · Edition 11.2014

Connect the battery monitoring control unit via its own sensor to the earth pole and via the LIN Bus with the diagnosis interface for the databus.

Removal:

Switch off ignition and take out ignition key.

Remove the cover (1).

E97-10621

Loosen the nut (1) by turning it a few times and separate the battery monitoring control unit J367 (4) from the earth pole on the battery.

Disconnect connector (2).

E97-10622

Loosen the nut (3 ) of the earthing bolt on the body

Remove the battery monitor control unit J367 (1).

Installation

Installation is carried out in reverse order, noting the following:

Earth pole nut to the bodywork (3), tightening torque 20 Nm

Negative terminal nut to the battery (1), tightening torque 6 Nm

The Battery monitoring control unit J367 must be adapted Chapter “Adapting battery monitoring control unit J367”

Note

  • When recharging the battery or jump starting vehicles with a start/stop system, the following must be observed: using the charging cable, first connect the positive terminal and then connect to the body earth. This ensures that the battery sensor is not bridged. The direct charging of the battery on the negative terminal clamp means that the battery sensor is shunted and the battery data are not registered by the sensor while charging. Then, the values concerning the battery state and saved in the data bus diagnostic interface would not correspond to the values of the charged battery.

Note

  • Vehicle diagnostic tester, Current flow diagrams, Electrical fault finding and Fitting locations, Start / Stop and Energy recovery, Instruction manual

Parts & tools for this job For 2008 SEAT Exeo

As an Amazon Associate we earn from qualifying purchases.