Gearbox removal, Ibiza 2008 ►, Ibiza ST 2010 ► → Chapter. |
Gearbox removal, Altea 2009 ►, Altea XL 2009 ►, Leon 2009 ► → Chapter. |
Installation is carried out in reverse order. However, the following important steps must be observed: |
Note t
| Always renew self locking nuts and bolts |
t
| Renew O-rings, seals, gaskets and bolts which are tightened by turning through a specified angle. |
t
| All cable ties which were opened or cut during removal must be renewed at the same points. |
t
| Clean the cogs of the input shaft and the teeth of the speed damper, eliminate corrosion and apply a very fine layer of lubricating grease to the cogs (assignment → Electronic spare parts catalogue „ETKA“). It is essential to remove excess grease. |
–
| If no dowel sleeves for centralising engine/gearbox are in the cylinder block, install dowel sleeves. |
|
|
|