seat Workshop Repair Guides

SEAT Workshop Service and Repair Manuals

Air conditioning equipment: removing and installing > < Air inlet opening with air recirculation / air retention (fresh air) flap: removing and installing
Removing, testing
Removing, testing
–  Remove the glove compartment and the central console → Bodywork, interior fitting work; Rep. Gr.68.
   
–  Fold the floor covering back in the area of the condensation drainage hose until the tube can be seen → Bodywork, interior fitting work; Rep. Gr.68.
–  Check the correct positioning of the condensation drainage tube -B- (eliminate any folding for example) and ensure that it is clean.
–  Cover the area under the passage -D- (for the drainage of the condensation water -C-) using absorbent paper (so that water does not go under the carpet).
–  Remove the condensation water drain -B-.
–  Check if the condensation water drainage tube of the air conditioning -A- is clean, for example use a piece of wire.
  E87-10017
–  Check the distance between the sound proofing cover fitted in the centre console and the condensation drainage valve -C- by the opening in the floor plate -D-, there should be enough space for the water condensation to come out of the water drainage valve -C-.
t  Installing
Installation is carried out in the reverse order of removing, when doing this note the following.
–  Fit the condensation drainage -B- so that it is not bent or trapped.
–  Ensure during fitting of the floor mat that the condensation drainage tube is not crushed -B-.
  E87-10017

Air conditioning equipment: removing and installing > < Air inlet opening with air recirculation / air retention (fresh air) flap: removing and installing