Installation is carried out in the reverse order; noting the following in the process: |
–
| Check sealing surfaces of receiver at condenser -2- for contamination or damage via opening. |
–
| Replace the seal of the cap -1- with the respective seal -3-. |
–
| Lightly moisten sealing cap seal -3- with refrigerant oil before installation. |
Ensure that seal is properly seated on sealing cap -3-. |
|
|
|