Deleting learned values from the engine control unit (AZJ) |
The learned values from the engine control unit must be deleted when replacing the injectors or the lamda probes in order to avoid any possible vehicle operating problems. |
Special tools and workshop equipment required |
t
| Vehicle system tester -V.A.G 1552- with cable -V.A.G 1551/3, 3A, 3B oder 3C- |
|
|
|