Install
- Make
- Skoda
- Model
- Rapid
- Year
- NA, 2011 on
- Section
- Gearbox 02R › Install
Install
Before installing, check the oil level and top up with gear oil Chapter “Check gear oil level”.
Capacity and specification Chapter “Identification characters, aggregate assignment, ratios, capacities”.
The installation of the gearbox occurs in reverse order. Observe the stress-free assembly bracket in the vehicle Engine Rep. Gr. 10.
If the gearbox is replaced, if provided always replace the speedometer sender (Fig), gearshift lever (Chapter “Summary of components - Shift lever and shift housing”) and relay lever.

Before installing the gearbox press the clutch release lever towards the gearbox housing and secure with mounting bolt or screw M 8 x 35.

After installing the gearbox release screw again. The hole is then closed by the 3 fixing screws for the support/control cables.
Note
- grease G 000 100.
- The clutch plate must slide freely up and down the drive shaft.
- If the gearbox is replaced, ensure the intermediate plate between the engine and gearbox is correctly installed.
- Check whether the dowel sleeves for centering the gearbox are present in the cylinder block; insert if necessary.
- Engine Rep. Gr. 10.
- Engine Rep. Gr. 26.
- Electrical System Rep. Gr. 27.
- Chapter “Setting shift mechanism (Fabia II, Roomster)”.
- Electrical System Rep. Gr. 27.
- Electrical System Rep. Gr. 27.
Parts & tools for this job For 2011 Skoda Rapid
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Skoda Rapid
As an Amazon Associate we earn from qualifying purchases.