Installation is carried out in the reverse order. However, pay attention to the following: |
Caution When undertaking all installation work, particularly in the engine compartment because of its cramped construction, please observe the following: |
t
| Lay lines of all kinds (e.g. for fuel, hydraulic fluid, the active charcoal container-unit, cooling fluid and refrigerant, brake fluid, vacuum) and electrical lines in such a way that the original line guide is re-established. |
t
| In order to avoid damage to the cables, ensure that there is adequate free access to all moving or hot components. |
|
Note t
| All cable straps should be fastened again in the same place when installing. |
t
| Replace the self-locking nuts and screws when undertaking assembly work. |
t
| Replace screws which have been tightened to a torquing angle as well as gasket rings and seals. |
t
| Clean the drive shaft serration and hub serration on used clutch discs, remove corrosion and only apply a very thin layer of grease -G 000 100- onto the serration. Subsequently move the clutch disc up and down on the drive shaft until the hub fits smoothly on the shaft. Remove all excess grease. |
Observe all safety measures and notes for assembly work on the fuel, injection and ignition system and the charge air system as well as rules for cleanliness → Chapter. |
–
| Insert new dowel sleeves for centering engine/gearbox in the cylinder block. |
|
|
|