4 Runner 4WD V8-4.7L (2UZ-FE) (2003)
6. INSTALL SKID CONTROL ECU ASSY
a. Install the skid control buzzer on the skid control ECU, and connect the skid control buzzer connector.
b. Install the skid control ECU assy with 2 nuts.
Torque: 5.0 Nm (51 kgf-cm, 44 inch lbs.)
c. Connect the 4 skid control ECU connectors.
7. INSTALL INSTRUMENT PANEL JUNCTION BLOCK ASSY
a. Install the instrument panel junction block assy with bolt and 2 nuts.
8. INSTALL INSTRUMENT PANEL LOWER LH
9. INSTALL INSTRUMENT PANEL FINISH PANEL SUB-ASSY LOWER
10. INSTALL INSTRUMENT PANEL FINISH PLATE
11. CHECK VSC SENSOR SIGNAL