FJ Cruiser 4WD V6-4.0L (1GR-FE) (2007)
Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf)
INSTALLATION
1. INSTALL VANE PUMP
(a)
Install the vane pump assembly with the 2 bolts.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
(b) Install the wire harness clamp bracket with the bolt.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
(c)
Connect the oil pressure switch connector.
NOTICE: Make sure that no oil adheres to the connector.
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a)
Install a new gasket onto the pressure feed tube.
(b) Install the pressure feed tube with the union bolt.
Torque: 51 N*m (520 kgf*cm, 38 ft.*lbf)