FJ Cruiser 4WD V6-4.0L (1GR-FE) (2007)
(h) Clamp the outer bearing race in a vise and tap off the flange yoke with a hammer.
(i)
Remove the spider.
REASSEMBLY
1. INSTALL REAR PROPELLER SHAFT UNIVERSAL JOINT SPIDER KIT
(a)
Apply MP grease to a new spider and spider bearings.
(b) Fit the spider into the flange yoke.
(c)
Using SST, install the spider bearings onto the spider.
SST 09332-25010
(d) Using SST, adjust both bearings so that the snap ring grooves are at maximum and equal in width.
SST 09332-25010
(e)
Install 4 new snap rings of equal thickness which will allow no axial play.
HINT: Do not reuse the snap rings.