toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Air Conditioning Unit|Page 6031 > < Air Conditioning Unit|Page 6029
Page 2
background image

a. Aligning the part to be fitted with that of the air conditioning radiator assembly, install the blower assembly.
b. Install the blower assembly with the bolt, nut and 2 screws.

Torque: BOLT . NUT 9.8 N.m (100 kgf.cm, 87 in.lbf)

c. Install the bracket with the 2 screws.
d. Install the connector and clamp.

2. INSTALL HYBRID VEHICLE CONTROL ECU
3. INSTALL AIR DUCT NO.2
4. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY

Disassembly and Reassembly

DISASSEMBLY

1. REMOVE COOLER COVER NO.1

a. Release the 2 claw fittings and remove the cooler cover No.1.

2. REMOVE CLEAN AIR FILTER

a. Remove the clean air filter.

3. REMOVE AIR INLET SERVOMOTOR

Air Conditioning Unit|Page 6031 > < Air Conditioning Unit|Page 6029