toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Components|Page 1772 > < Components|Page 1770
Page 2
background image

28. REMOVE CHAIN SUB-ASSEMBLY   See: Seals and Gaskets/Cylinder Head Gasket/Service and Repair/Removal

29. REMOVE NO. 2 CHAIN VIBRATION DAMPER   See: Engine Lubrication/Oil Pump/Service and Repair/Removal and Replacement/Removal

30. INSPECT CAMSHAFT TIMING GEAR ASSEMBLY

(a) Inspect the lock of the camshaft timing gear.

(b) After cleaning and degreasing the VVT oil hole on the intake side of the No. 1 camshaft bearing cap, completely seal the oil hole with adhesive

tape or equivalent as shown in the illustration to prevent air from leaking.

NOTICE:
Be sure to seal the oil hole completely because air leaks due to insufficient sealing will prevent the lock pin from being released.

(c) Prick a hole in the tape covering the oil hole as shown in the illustration. (Procedure A)

(d) Apply approximately 150 kPa (1.5 kgf/cm2, 22 psi) of air pressure to the hole pricked in procedure A to release the lock pin.

NOTICE:
*

If air leaks out, reattach the adhesive tape.

*

Cover the oil hole with a piece of cloth when applying air pressure to prevent oil from spraying.

(e) Forcibly turn the camshaft timing gear assembly in the advance direction (counterclockwise).

HINT
Depending on the air pressure applied, the camshaft timing gear assembly may turn in the advance direction without assistance by
hand.

(f) Turn the camshaft timing gear assembly within its movable range (26.5 to 28.5°) 2 or 3 times without turning it to the most retarded position.

Make sure that the camshaft timing gear assembly turns smoothly.

Components|Page 1772 > < Components|Page 1770