toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Floor Shift Cable Transmission Control Shift Replacement|Page 3722 > < Floor Shift Cable Transmission Control Shift Replacement|Page 3720
Page 3
background image

a. Pull in the select cable to the floor.

b. Install the shift cable grommet retainer with the 2 bolts. 

Torque: 5.0 Nm (51 kgf-cm, 44 inch lbs.) 

c. Connect the select cable to the shift lever assy.

NOTICE: 
^

The projecting part of the cable outer should face upward when the shift cable is installed.

^

Make sure that after installation the cable outer spring is moved to the place shown in the illustration.

d. Connect the select cable end with the clip to the shift lever assy.
e. Connect the select cable to the clamp.

f.

Connect the select cable with the 2 nuts. 
Torque: 5.0 Nm (51 kgf-cm, 44 inch lbs.) 

Floor Shift Cable Transmission Control Shift Replacement|Page 3722 > < Floor Shift Cable Transmission Control Shift Replacement|Page 3720