toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Timing Belt Removal|Page 655 > < Timing Belt Removal|Page 653
Page 8
background image

Torque: 18 N.m (180 kgf.cm, 13 ft.lbf) 

(b) Connect the high-tension cords as shown.
(c) Install the cord support bolt to the cylinder head cover.

17. INSTALL RH ENGINE MOUNTING INSULATOR

(a) Attach the RH mounting insulator to the mounting bracket and body, and temporarily install the through bolt, 2 bolts and nut.

(b) Torque the 2 bolts, nut and through bolt of the RH mounting insulator.

Torque:

73 N.m (740 kgf.cm, 54 ft.lbf) for Through bolt 
64 N.m (650 kgf.cm, 47 ft.lbf) for Others
 

18. INSTALL VSV ASSEMBLY

Timing Belt Removal|Page 655 > < Timing Belt Removal|Page 653