toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

A/T - Transmission Oil Cooler Flushing|Page 1343 > < A/T - Transmission Oil Cooler Flushing|Page 1341
Page 8
background image

Step 8

Connect the new oil to air cooler in series with the factory oil to
water cooler by removing the OEM outlet hose and connecting the new hoses from the oil to air cooler to the factory tubing as shown in
Figure 9.

Step 9  Final assembly

A.

Install radiator grille, making certain that there is no interference between the grille and the oil cooler lines.

Figure 10

B.

If interference does exist, file the radiator grille to, provide clearance. (See Figure 10)

C.

Complete final installation of the grille and front bumper.

D.

Fill transmission with new Dexron II ATF fluid (will require approximately 2 liters).

E.

Start engine and check all connections for leaks.

F.

After transmission has reached operating temperature, check fluid level and add as necessary.

Section 2 - Valve Body Modification

SECTION 2 - Installation procedure for kit #2, Valve Body Modification  (P/N 04006 - 10235)

 Oil Cooler Tube Kits (P/N 32921 - 35120) & (P/N 32922 - 35140)

Step 1  Verify that the vehicle was built:

Thru      :

January 1986

Ending VIN:

RN5S-7004790 (cab chassis) RN7S-0004786 (cab chassis)

If your vehicle was built after the above date, the following procedure is not required. Return to Step 8 in Section 1.

Step 2  Installation of valve body modification kit.

A.

If the oil has not been drained as instructed in Section 1 do so now.

A/T - Transmission Oil Cooler Flushing|Page 1343 > < A/T - Transmission Oil Cooler Flushing|Page 1341