toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Body and Frame > < Frame - Installation of Receiver-Type Hitch
Page 2
background image

Modification of Flange Holes (Lower Side fo Frame Rails)

Drill-out (enlarge) two of the existing vehicle frame holes (# 3 and # 4 in the illustration) to a final diameter of 11/16". Be certain to spray a coating of
anti-corrosion material on the two enlarged holes.

Body and Frame > < Frame - Installation of Receiver-Type Hitch