Sequoia 4WD V8-4.6L (1UR-FE) (2010)
(a) Install the motor with the 3 screws.
(b) Connect the connector and 2 clamps.
2. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard /
Instrument Panel/Service and Repair/Installation