Sequoia LTD 4WD V8-4.7L (2UZ-FE) (2001)
c. Using a screwdriver, hold the spring back and disconnect the brush from the brush holder. Disconnect the 4 brushes, and remove the brush
holder.
NOTE: Check that the positive (+) lead wires are not grounded.
5. REMOVE ARMATURE FROM FIELD FRAME
REASSEMBLY
Reassembly is in the reverse order of disassembly.
HINT: At the time of assembly, please refer to the following items.
Use high-temperature grease to lubricate the bearing and gears when assembling the starter.
REPLACEMENT
1. REPLACE REAR BEARING
a. Using SST, remove the bearing.
SST 09286-46011
b. Using a press, press in a new bearing.
2. REPLACE FRONT BEARING