Sequoia LTD 4WD V8-4.7L (2UZ-FE) (2001)
2. INSTALL NEW BUSHING
Using SST, a press and steel plate, install a new bushing.
SST 09631-12090, 09710-30021 (09710-03051)
INSTALLATION
1. INSTALL UPPER SUSPENSION ARM
Install the upper suspension arm with 2 washers, bolt and nut.
Torque: 98 Nm (1,000 kgf-cm, 72 ft. lbs.)
HINT: After stabilizing the suspension, torque the nut.
2. INSTALL BRAKE AND FUEL LINE CLAMP
Torque: 5.5 Nm (56 kgf-cm, 49 inch lbs.)
3. INSTALL FENDER APRON SEAL REAR
4. CONNECT UPPER BALL JOINT
a. Connect the upper ball joint to the upper suspension arm.
b. Install the nut and a new cotter pin.
If the holes for the cotter pin are not aligned, tighten the nut further up to 60°.
Torque: 105 Nm (1,100 kgf-cm, 77 ft. lbs.)
5. CONNECT SPEED SENSOR WIRE HARNESS CLAMPS
Torque: 8.0 Nm (82 kgf-cm, 71 inch lbs.)
6. INSTALL SHOCK ABSORBER WITH COIL SPRING
7. CHECK FRONT WHEEL ALIGNMENT