toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Timing Belt Removal|Page 602 > < Timing Belt Removal|Page 600
Page 6
background image

No. 1 Cover (Front)

-

Remove the backing paper from a new gasket and install the gasket evenly to the part of the belt cover shaded back in the illustration.

(b) Install the timing belt cover with the 4 bolts.

Torque: 9 N.m (90 kgf.cm, 80 in.lbf)

(c) Install the starter wire bracket with the 2 bolts.

13. Install crankshaft pulley.

(a) Align the pulley set key with the key groove of the pulley, and slide the pulley.
(b) Using SST 09213-54015 (90119-08216), 09330-00021, install and torque the bolt. 

Torque: 250 N.m (2,500 kgf.cm, 184 ft.lbf)

14. Install fan bracket.

(a) Install the fan bracket with the bolt and nut.
(b) Install the PS pump adjusting strut with the nut.

15. Install No.2 timing belt cover.

(a) Check that the timing belt cover gasket has no cracks or peeling, etc.

If the gasket does have cracks or peeling, etc., replace it using following steps.
-

Using a screwdriver and gasket scraper, remove all the old gasket material.

-

Thoroughly clean all components to remove all the loose material.

-

Remove the backing paper from a new gasket and install the gasket evenly to the part of the belt cover shaded black in the illustration.

(b) Install the belt cover with the 6 bolts.

Torque: 9 N.m (90 kgf.cm, 80 in.lbf)

(c) Connect the 4 high-tension cord clamps and camshaft position sensor connector to the No.2 timing belt cover.

16. Install oil dipstick and guide.

(a) Install a new O-ring to the dipstick guide.
(b) Apply soapy water to the O-ring.
(c) Install the oil dipstick and guide to the cylinder block.

Timing Belt Removal|Page 602 > < Timing Belt Removal|Page 600