T100 Regular Cab Pickup 2WD L4-2693cc 2.7L DOHC MFI (1998)
HINT: Install the center support bearing in the direction, as shown.
5. INSTALL YOKE ON INTERMEDIATE SHAFT
a. Coat the splines of the intermediate shaft with MP grease.
b. Place the center yoke on the shaft and align the matchmarks.
HINT: If replacing either the center yoke or intermediate shaft, reassemble them so that the front side yoke of the intermediate shaft and the
center yoke are facing in the same direction.
c. Clamp the yoke in a vise, press the bearing into position by tightening down a new nut.
Torque: 181 Nm (1,850 kgf-cm, 134 ft. lbs.)
d. Loosen the nut.
e. Torque the nut again.
Torque: 81 Nm (830 kgf-cm, 60 ft. lbs.)
f.
Using a hammer and punch, stake the nut.
6. CONNECT PROPELLER SHAFT AND INTERMEDIATE SHAFT
Assemble center yoke (See SPIDER BEARING REPLACEMENT).
INSTALLATION
1. INSTALL PROPELLER SHAFT
a. Remove SST from the transmission.
SST 09325-40010
b. Insert the yoke into the transmission.
c. Temporarily install the center support bearing with 2 mounting bolts.
HINT: Make sure the bearing is installed with facing the drain hole downwards.