Venza FWD V6-3.5L (2GR-FE) (2010)
Text in Illustration
(h) Install the bolt.
Torque : 19 Nm (194 kgf-cm, 15 ft-lbf)
(i) Install the 2 nuts and screw.
(j) Engage each clamp.
(k) Connect the blower motor connector.
(l) Connect each connector.
Text in Illustration
3. INSTALL NO. 2 INSTRUMENT PANEL BRACE SUB-ASSEMBLY
(a) Install the screw.