Venza FWD V6-3.5L (2GR-FE) (2010)
![background image](/toyota/venza_fwd/v6-3.5l_(2gr-fe)/Page-1882033.png)
(b) Install the No. 2 instrument panel brace sub-assembly with the bolt and 2 nuts.
(c) Connect the earth wire with the bolt.
Torque : 8.4 Nm (86 kgf-cm, 74 in-lbf)
(d) Engage each clamp.
Text in Illustration
4. INSTALL NO. 1 INSTRUMENT PANEL BRACE SUB-ASSEMBLY
(a) Install the screw.
(b) Install the No. 1 instrument panel brace sub-assembly with the 2 bolts and 2 nuts.
(c) Connect the earth wire with the bolt.
Torque : 8.4 Nm (86 kgf-cm, 74 in-lbf)
Text in Illustration
(d) Engage each clamp.