vauxhall Workshop Repair Guides

Vauxhall Workshop Service and Repair Manuals

Injectors, Remove and Install > < Coolant Pump, Remove and Install

Throttle Body, Remove and Install (X 20 XEV, X 20 XER)

  Remove

Remove air cleaner housing – see illustration "Air Duct (X 20 XEV, X 20 XER)".

Reduce fuel pressure with Pressure Tester KM-J-34730-91 via testing port – collect escaping fuel in suitable container – observe safety regulations and national legislation.

Detach fuel return line (1) from fuel pressure regulator and detach Bowden cable bracket.

Disconnect wiring harness plug (2) from idle air control.

Lift retainer for accelerator Bowden cable (3) with screwdriver and remove ball socket for accelerator Bowden cable (5) from ball head.

For version with electronic cruise control: remove shackle for cruise control Bowden cable from ball head – see operation "Cruise Control – Bowden Cable, Remove and Install".

Detach Bowden cable retainers (4) from throttle body and lay aside with Bowden cables towards rear.

Object Number: 2414847  Size: DEFAULT

Detach vacuum hose of fuel pressure regulator (1) from throttle body.

Detach coolant hose (2) and engine vent hose (3) from throttle body.

Disconnect wiring harness plug from throttle valve potentiometer.

Unscrew fastening nuts (arrows) for throttle body, remove throttle body from intake manifold.

Object Number: 2392487  Size: DEFAULT

Caution

Mask intake manifold opening – foreign bodies can cause severe engine damage. Clean sealing surfaces and remove gasket residue. Ensure utmost cleanliness – do not damage sealing surfaces.

  Install

Attach throttle body to intake manifold with new gasket – tightening torque 9 Nm / 7 lbf. ft.

Connect wiring harness plug to throttle valve potentiometer.

Install engine vent hose, coolant hoses and vacuum hose for fuel pressure regulator.

Attach Bowden cable bracket to throttle body.

For version with electronic cruise control: attach shackle for cruise control Bowden cable to ball head – see operation "Cruise Control – Bowden Cable, Remove and Install".

Connect ball socket for accelerator Bowden cable to ball head – ensure that retainer engages.

Attach wiring harness plug to idle air control.

Attach fuel return line to fuel pressure regulator – tightening torque 15 Nm / 11 lbf. ft.

Attach fuel return line to bracket for Bowden cables – tightening torque 9 Nm / 6.5 lbf. ft.

Install air cleaner housing – see illustration "Air Duct (X 20 XEV, X 20 XER)".

  Inspect

Charge cooling system – see operations "Cooling System, Charge and Bleed" and "Cooling System, Check for Leaks".


Related Literature Units
-
-
-
-
-
-

Injectors, Remove and Install > < Coolant Pump, Remove and Install