Replace folding roof hinge hydraulic line guide
inner panelling
Remove
|
1. |
Place folding top in service position
• |
Use special tool BO-47651-200 (1)
|
• |
Secure roof with accompanying tensioner belt (2)
|
|
|
2. |
Detach wiring guide inner panelling
• |
Unclip and remove upper wiring guide cover (1)
|
• |
Remove 2x hydraulic pipelines
Note: Mark installation
position of the pipelines.
|
• |
Detach lower wiring guide cover (2)
|
|
|
|
Install
3. |
Attach wiring guide inner panelling
• |
Attach lower wiring guide cover
|
• |
Insert 2x hydraulic pipelines
Note: Note installation
position of the pipelines
|
• |
Clip in upper wiring guide cover
|
|
4. |
Close folding top
• |
Remove special tool BO-47651-200
|
|
|