Replace turbocharger oil feed line (automatic
transmission)
Remove
2. |
Disconnect battery
• |
Detach ground connection from ground terminal
|
|
4. |
Remove air cleaner housing
|
5. |
Detach coolant compensation tank cover
|
6. |
Remove front panelling
|
7. |
Secure radiator at upper radiator brackets (1)
• |
Insert 2x suitable tools
|
|
|
|
8. |
Raise vehicle by half its height
|
9. |
Detach the lower engine cover and right engine splash guard
|
10. |
Remove lower radiator bracket (1)
Note: Note: brackets
are not the same
|
|
|
Important: Take care not to
damage attaching parts
|
11. |
Pull cooling module forwards in direction of arrow
• |
Secure with suitable tool (1)
|
|
12. |
Detach bracket for oil coolant lines (3) from engine damping
block (front)
|
|
|
13. |
Detach turbocharger oil feed line
|
Install
14. |
Install turbocharger oil feed line
|
15. |
Attach bracket for oil coolant lines to engine damping block
(front)
|
16. |
Install lower radiator bracket
Note: Note: brackets
are not the same
• |
Screw in 4x bolts 15 Nm
|
|
17. |
Attach the lower engine cover and right engine splash guard
|
18. |
Lower vehicle by half its height
|
19. |
Remove 2x retainers from upper radiator bracket
|
21. |
Install air cleaner housing
|
23. |
Fill with coolant and bleed
|
24. |
Connect battery
• |
Attach ground connection to ground terminal
|
|
25. |
Program volatile memories
|
|