Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.6 l)02 4 - Cyl. injection engine (1.6 l) EA21103 Troubleshooting, Mechanical Transmission04 5 - Speed manual gearbox (0AP, 02T)05 5 - Speed automated transmission (ASG) 0C306 Brake systems07 Running gear, axles, steering08 Wheels and Tyres - Specifications09 Heating, air conditioning10 Electrical system11 Electrical: Communication12 General body repairs, exterior13 General body repairs, interior
Volkswagen Gol G6 with Voyage and Saveiro, Brazil (2012-2016)09 · Heating, air conditioning
09 · Heating & A/C

Installation

Make
Volkswagen
Model
Gol G6 with Voyage and Saveiro, Brazil
Year
2012–2016
Section
Refrigerant circuit - assembly overview › Installation
Heating, air conditioningInstallation

Installation

Engine

Installation is performed in reverse sequence to the removal, observing the following:

Install the Poly-V belt EngineRep. gr.13Crankshaft, pistons.

Note

  • During the installation of the Air conditioning magnetic clutch N25, the pin (B) must be fitted into the cavity (A).
R87-10169

Warning Replace the bolt that fastens the coupling disc to the compressor axle.

Tighten the securing bolt (1) to (9.5...12 Nm) towards (arrow) while moving the Locking rod for Poly-V Belt EQ 7112 anticlockwise, as indicated by (arrow).

R87-10170

Note

  • In case of replacing the coupling disc and/or Air conditioning magnetic clutch N25, use the proper number of adjustment washers.

To do so, check the distance between the coupling disc and the pulley.

Inspection of gap between clutch and pulley:

Check the gap between clutch and pulley with a feeler gauge.

The gap between clutch and pulley must be inspected at 3 different points, spaced at 120° from one another (arrows).

R87-10171

Between clutch and pulley, obtain a gap of 0.3... 0.9 mm.

The average among the 3 measurements taken must be lees than 0.6 mm.

The inspection procedure must be repeated until the specified gap is reached.

Start the engine.

Activate the compressor by turning the air conditioner on.

The compressor must remain on for 15 sec., and off for 15 sec. This operation must be repeated 5 times.

Inspect again the space between clutch and pulley.

If the space is not in accordance with the specifications, repeat the inspection procedure completely

Parts & tools for this job For 2012 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.