Installation
- Make
- Volkswagen
- Model
- Gol G6 with Voyage and Saveiro, Brazil
- Year
- 2012–2016
- Section
- Refrigerant circuit - assembly overview › Installation
Installation
Installation is performed in reverse sequence to the removal, observing the following:
Install the Poly-V belt EngineRep. gr.13Crankshaft, pistons.
Note
- During the installation of the Air conditioning magnetic clutch N25, the pin (B) must be fitted into the cavity (A).

Warning Replace the bolt that fastens the coupling disc to the compressor axle.
Tighten the securing bolt (1) to (9.5...12 Nm) towards (arrow) while moving the Locking rod for Poly-V Belt EQ 7112 anticlockwise, as indicated by (arrow).

Note
- In case of replacing the coupling disc and/or Air conditioning magnetic clutch N25, use the proper number of adjustment washers.
To do so, check the distance between the coupling disc and the pulley.
Check the gap between clutch and pulley with a feeler gauge.
The gap between clutch and pulley must be inspected at 3 different points, spaced at 120° from one another (arrows).

Between clutch and pulley, obtain a gap of 0.3... 0.9 mm.
The average among the 3 measurements taken must be lees than 0.6 mm.
The inspection procedure must be repeated until the specified gap is reached.
Start the engine.
Activate the compressor by turning the air conditioner on.
The compressor must remain on for 15 sec., and off for 15 sec. This operation must be repeated 5 times.
Inspect again the space between clutch and pulley.
If the space is not in accordance with the specifications, repeat the inspection procedure completely
Parts & tools for this job For 2012 Volkswagen Gol
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Volkswagen Gol 2012 cabin filter
As an Amazon Associate we earn from qualifying purchases.