Installation
- Make
- Volkswagen
- Model
- Gol G6 with Voyage and Saveiro, Brazil
- Year
- 2012–2016
- Section
- Refrigerant circuit - assembly overview › Installation
Heating, air conditioningInstallation
Installation
Installation is performed in reverse sequence to the removal, observing the following:
Tighten the fastening screws (4) to the compressor (1).

Remove the refrigerant hoses (1) and (2).

Tighten the fastening screws (arrows)
Observe the fastening screw tightening sequence:
- EA111 engines → Chapter
- EA211 engines → Chapter
Parts & tools for this job For 2012 Volkswagen Gol
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Volkswagen Gol 2012 cabin filter
As an Amazon Associate we earn from qualifying purchases.