Installation is carried out in the reverse order. When installing, note the following: |
Note After installing heat exchanger for high voltage battery -VX63-, bleed coolant circuit. Information about bleeding the coolant circuit is available from the E-field service team. |
–
| Always renew O-rings and moisten them with refrigerant oil. |
Note t
| Refrigerant shutoff valve for air conditioning system -N541- and refrigerant shutoff valve for heat exchanger of high voltage battery -N542- must be open for filling and extraction of refrigerant. |
t
| When filling and extracting refrigerant, a voltage of 12V must be applied to the shutoff valves. |
|
|
|