Installing
- Make
- Volkswagen
- Model
- LT Mk2
- Year
- 1996–2006
- Section
- Three-way tipper › Installing
General body repairs, exteriorInstalling
Installing
Installation is carried out in the reverse order.
When installing high pressure hose, ensure that it is not twisted.
Once connections have been screwed on fully (tight), tighten connections (2) and (3) another 1/4 turn (90°) further.
Replenish any oil that has escaped and tilt tipper body up and down several times to bleed system and check for leaks. MaintenanceBooklet11.1
Parts & tools for this job For 1996 Volkswagen LT
- TOOLTrim removal tool kitSearch: trim removal tool kit
- PARTTouch-up paintSearch: Volkswagen touch up paint
- PARTPanel clip assortmentSearch: Volkswagen panel clips assortment
As an Amazon Associate we earn from qualifying purchases.