volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Intake Air Control Valve, Turbocharger > < Diagram Information and Instructions|Page 5451
Page 1
background image

Exhaust Bypass Valve: Testing and Inspection

Charge Pressure Bypass Valve, Checking

Special tools, testers and auxiliary items required

-

Hand vacuum pump V.A.G 1390

Requirements

-

Poor performance or load change jerks

-

Turbocharger noise when closing the throttle valve

Work sequence

NOTE:  The charge pressure bypass valve is located in front of the turbocharger. It is opened by vacuum in the overrun phase and at idling speed.

-

Connect hand vacuum pump V.A.G 1390 to vacuum connection of charge pressure bypass valve.

-

Operate hand vacuum pump.

-

Charge pressure bypass valve must open - arrow -

-

Ventilate valve on hand vacuum pump.

-

Charge pressure bypass valve must close - arrow -

If the valve does not open or close:

-

Replace charge pressure bypass valve.

NOTE:  The charge pressure bypass valve connections must be secured with spring-type clamps.

Intake Air Control Valve, Turbocharger > < Diagram Information and Instructions|Page 5451