Workshop Manuals Factory service & repair Volkswagen
01 5-cylinder injection engine, mechanics02 4-cylinder injection engine03 5-cylinder injection engine (4-valve), mechanics04 4-cylinder diesel engine with distributor-type injection pump05 4-cylinder diesel engine (2.0 l engine)06 4-cylinder injection engine (5-valve)07 4-cylinder diesel engine with unit injector08 4-cylinder injection engine (5-valve without intermediate shaft)09 Motronic injection and ignition system (5-cyl. 4-valve)10 6-cylinder injection engine11 4-cylinder injection engine (2-valve without intermediate shaft), mechanics12 8-cylinder injection engine13 5-speed automatic gearbox four-wheel drive 01V14 4-speed automatic gearbox 01N15 5 and 6-speed manual gearbox 01E, 0A116 Servicing automatic gearbox 01V, front-wheel drive and all-wheel drive17 6-speed manual gearbox 01E, four-wheel drive18 6-speed manual gearbox 0A219 5-speed manual gearbox 012/01W/0A920 5-speed manual gearbox 01A, all-wheel drive21 5-speed automatic gearbox 01V22 Running gear, Axles, Steering, Front and four wheel drive23 Protect brake systems24 Running gear, axles, steering, Protect25 Brake systems26 Heating, air conditioning27 Electrical system self-diagnosis28 Electrical system29 Protect Electrical system.30 Electrical: Communication31 General body repairs, exterior32 General body repairs, interior33 Body Protect34 6-cylinder diesel engine
Volkswagen Passat B5 (1996-2005)21 · 5-speed automatic gearbox 01V
21 · Transmission

Installing

Make
Volkswagen
Model
Passat B5
Year
1996–2005
Section
Removing and installing gearbox › Installing
5-speed automatic gearbox 01VInstalling

Installing

Running gear, axles, steering - front and four-wheel drive

Clean ATF cooler and ATF lines before installing an exchange gearbox → Chapter.

Only when ATF lines on gearbox have been removed:

Always replace O rings (1).

N37-0490

Moisten new O-rings with ATF and insert.

Ensure that O-rings are seated correctly so that they do not slip when ATF lines are inserted.

Insert ATF lines completely to stop in gearbox by hand.

Do not tighten bolt (2) until all the ATF lines have been connected Item.

Before installing gearbox, ensure that torque converter seats correctly in gearbox → Chapter.

Before installing, ensure that dowel sleeves are correctly located.

Set up gearbox support 3282.

N37-0912

Set up gearbox support 3282 for automatic gearbox 01V with adjusting plate 3282/19.

The symbols on the adjusting plate indicate the mounts required; the arrow points forward.

Move engine and gearbox jack V.A.G 1383 A with gearbox support 3282 under vehicle, align adjusting plate parallel to gearbox and support gearbox.

Secure gearbox to gearbox support 3282 using bolt (A).

N37-0426

Place gearbox jack under vehicle.

Guide gearbox in between lowered subframe and underbody.

Align gearbox to engine.

Screw in one engine/gearbox connecting bolt hand-tight on each side.

Bolt torque converter and drive plate together.

To do this, screw in the bolts by hand and tighten to 85 Nm.

A37-0479

Additionally bolt on a bracket or an earth connection at many connecting bolts → Chapter.

Screw in upper engine/gearbox connecting bolts and tighten to specified torque → Chapter.

Now step onto step ladder VAS 5085 to lower the engine/gearbox unit using the spindles.

Lift up the engine/gearbox unit by turning the spindles through approx. 8 turns.

N37-0893

When doing this, lift the engine/gearbox unit on the spindles, working alternately 2 turns at a time.

At the same time, lift the engine/gearbox unit using engine and gearbox jack V.A.G 1383 A (2nd mechanic).

1. Installing subframe with wheel alignment

2. Installing subframe without wheel alignment

1. Wheels must be aligned if holes (1) and (2) did not align Anchor before the subframe was removed.

N37-0916

Install subframe using bolts originally removed. These bolts must be renewed following wheel alignment.

Tighten old bolts to specified torque without additional part-turn Running gear, axles, steering - front and four-wheel driveRep. Gr.40Repairing front suspension; Removing and installing subframe.

Warning The vehicle must not be driven in this state.

2. No wheel alignment is required if holes (1) and (2) have been lined up Anchor.

Install subframe with new bolts, observing the tightening sequence Running gear, axles, steering - front and four-wheel driveRep. Gr.40Repairing front suspension; Removing and installing subframe.

Bolt engine bearings onto subframe according to markings made for threaded connections (1) and locating sleeves (2).

A10-0403

Screw on nuts (1) below on left and right engine mountings Running gear, axles, steering - front and four-wheel driveRep. Gr.40Repairing front suspension; Removing and installing subframe.

N37-0890

Screw in new gearbox mounting/subframe bolts (2)Chapter.

After subframe has been bolted to body, and engine/gearbox unit to subframe, remove bolt (A).

N37-0426

Remove engine and gearbox jack V.A.G 1383 A.

Apply anti-corrosion agent to point of contact between bolt (A) and oil pan.

Screw in engine/gearbox connecting bolts at the sides and the bottom and tighten to specified torque → Chapter.

Install retaining clip for coupling rod of vehicle level sender G78 on front left track control link Running gear, axles, steering - front and four-wheel driveRep. Gr.40Electric and electronic components and locations; Vehicle level sender G78 on front axle.

Do not bend or kink selector lever cable. Grease cable eye and ball socket with polycarbonate grease G 052 142 A2 before installing.

Move selector shaft lever (2) on gearbox in (direction of arrow) to position “2” and carefully use a pair of pliers to press the ball head of selector lever cable (1) onto the lever of the selector shaft.

N37-0911

Take care not to bend selector shaft lever (2), because otherwise it will not be possible to precisely adjust selector mechanism.

Press selector lever cable (1) fully forwards (arrow) to engage selector shaft lever (2) in position “2”.

Bolt support bracket of selector lever cable to gearbox at marked location → Chapter.

A37-0483

Install selector lever cable guard plate (A) and tighten bolts (1) and (4)Chapter.

A37-0350

Install starter Electrical systemRep. Gr.27Starter; Removing and installing starter.

Fit heat shield (A) to vehicle underbody.

Fit ATF lines (1) to engine/gearbox unit and screw tight Item.

N37-0699

Screw the bracket for the ATF line onto the engine oil sump Item.

A37-0480

Plug connector into multi-function switch (2).

A37-0478

Fit connector for gearbox wiring harness and secure with locking lever (3).

Install noise insulation bracket (1)General body repairs, exteriorRep. Gr.50Body front; Assembly overview - noise insulation.

Replace cable tie (4).

Push the plug onto speedometer sender G22(arrow A).

N37-0703

Screw engine speed sender G28(arrow B) onto gearbox.

Install drive shafts (1) onto flange shafts Running gear, axles, steering - front and four-wheel driveRep. Gr.40Repairing drive shafts; Removing and installing drive shafts.

A34-0138

Install guard plates for left and right drive shafts (arrows). The third bolt is not visible in the figure. Running gear, axles, steering - front and four-wheel driveRep. Gr.40Repairing drive shafts; Removing and installing drive shafts.

Install front exhaust system with catalytic converter6-cylinder injection engine, mechanicsRep. Gr.26Removing and installing parts of the exhaust system.

Install noise insulation elements (arrows).

N02-0130

In vehicles with an auxiliary heater, screw the exhaust pipe firmly onto the noise insulation.

Install front wheels Running gear, axles, steering - front and four-wheel driveRep. Gr.44Torque settings for wheel bolts.

Remove support device 10-222A.

Fit the intake hose onto the induction manifold.

Put on the engine cover and engage bolts (arrows).

A10-0113

Connect the battery earth strap Electrical systemRep. Gr.27Battery; Disconnecting and connecting battery.

Initialise electric windows and set clock MaintenanceBooklet36.

Code radio Radio, telephone, navigationRep. Gr.91Radio, telephone, navigation.

Check selector lever cable adjustment and adjust if necessary → Chapter.

With gearbox installed, check gear oil level in final drive → Chapter.

Finally, check ATF level and top up → Chapter.

When checking ATF level, check ATF line connections (A) and (B) for leaks.

N37-0490

Check connections (1) of the ATF lines for leaks when checking ATF level.

N37-0699

There is no need to take account of bolts (2) and (3) in this case.

Parts & tools for this job For 1996 Volkswagen Passat

As an Amazon Associate we earn from qualifying purchases.