Notes on installing
- Make
- Volkswagen
- Model
- Passat B5
- Year
- 1996–2005
- Section
- Removing and installing engine › Notes on installing
Notes on installing
Installation is carried out in the reverse order. When installing, note the following:
Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:
- Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant, refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
- Ensure that there is sufficient clearance to all moving or hot components.
On assembly, renew oil seals and gaskets as well as self-locking nuts and bolts that are tightened by turning through to a specified angle.
Before installing engine, check that brace (B) is still swung to the side -direction of arrow-. After engine is installed, the brace will be swung down.

Check whether dowel sleeves for centring engine and gearbox are in cylinder block and install if necessary.
Only use nuts approved in parts programme to secure torque converter to drive plate.
If the converter is correctly positioned, the distance between the contact surfaces below at the tapped holes in the converter and the contact surface of the converter bell of automatic gearbox 01V is about 23 mm.

Warning If the torque converter is not installed correctly, the drive lugs of the torque converter and the ATF pump will be seriously damaged when the gearbox is joined to the engine.
Secure ATF lines to ATF cooler. 5-speed automatic gearbox 01VRep. Gr.37Dismantling and assembling gearbox; Removing and installing ATF lines on vehicles with a V6 TDI engine.
Check ATF level. 5-speed automatic gearbox 01VRep. Gr.37Checking ATF level and topping-up; Checking ATF level.
Allow torque reaction support to move under own weight onto torque reaction support buffer and tighten to 25 Nm.
Install power steering vane pump. Running gear, axles, steering - front and four-wheel driveRep. Gr.48Assembly overview - vane pump, reservoir, hydraulic lines.
Align engine mountings free of tension by rocking engine.
Install air conditioner compressor. Heating, air conditioningRep. Gr.87Manually controlled air conditioning system; Air conditioner compressor bracket.
Install poly-V-belt. Chapter
Install lock carrier with attachments. General body repairs, exteriorRep. Gr.50Body - front.
Electrical connections and routing Electrical systemRep. Gr.97.
Fill coolant system with coolant → Chapter. .
Note
- Do not reuse dirty coolant.
Bleed fuel system → Chapter.
Warning Attempts to start engine before fuel system is bled could lead to injection pump damage.
Carry out road test and read fault memory. Chapter
Check headlight adjustment and correct if necessary MaintenanceBooklet.
Parts & tools for this job For 1996 Volkswagen Passat
- PARTEngine gasket setSearch: Volkswagen Passat 1996 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.