Procedure
- Make
- Volkswagen
- Model
- Passat B5
- Year
- 1996–2005
- Section
- Removing and installing engine › Procedure
Procedure
With ignition switched off, disconnect earth strap at battery.
Install lock carrier with attachments. General body repairs, exteriorRep. Gr.50Body - front.
Detach ATF lines from gearbox. 5-speed automatic gearbox 01VRep. Gr.37Dismantling and assembling gearbox; Removing and installing ATF lines on vehicles with a V6 TDI engine.
Drain coolant → Chapter.
Remove engine cover first.
Remove air intake duct (1) and cover (2).

Remove intake manifold cover.
Remove air duct in front of charge air cooler (arrows).

Clamp off fuel supply and return lines on fuel filter.
Warning
- The fuel and the fuel lines in the fuel system can become very hot (danger of scalding)!
- The fuel system is also under pressure! Before opening the system, place cloths around the connections. Then carefully loosen connection to release the pressure!
- Wear eye and hand protection when performing any type of repair work on the fuel system!
Disconnect inter-connecting, coolant, vacuum and intake hoses on engine.
Remove cover (arrow) at power steering fluid reservoir.

Pull off/disconnect all electrical connections as necessary from engine and lay to one side.
Remove heat shield over turbocharger.
Remove front exhaust pipe with catalytic converter or starter catalytic converter. Item
Remove viscous fan. Fig.
Remove poly-V-belt. Chapter
Parts & tools for this job For 1996 Volkswagen Passat
- PARTEngine gasket setSearch: Volkswagen Passat 1996 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.