Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)02 4-cyl. direct injection engine (1.8 l and 2.0 l, 4 V, EA 888 gen III, turbocharger, chain drive)03 Fuel supply system - Petrol engines04 Fuel supply system - Diesel engines05 4-cylinder common rail engine (1.6 l and 2.0 l, 4V, turbocharger, EA288)06 4-cylinder common rail engine (2.0 l, 4V, bi-turbo, EA288)07 Fuel supply system - petrol engines, hybrid vehicles08 4-cylinder injection engine (hybrid)09 Propshaft and rear final drive10 6-speed dual clutch gearbox 0D911 7-speed dual clutch gearbox 0CW12 6-speed dual clutch gearbox 0DD, hybrid vehicles13 6-speed manual gearbox 0AJ14 6-speed manual gearbox 02S15 6-speed manual gearbox 02Q, 0BB and 0FB16 7-speed dual clutch gearbox 0DL17 Brake system18 Running gear, axles, steering19 Wheels and Tyres Guide20 Brake system (hybrid)21 Heating, air conditioning22 Heating and air conditioning: Auxiliary heater23 Electrical: Communication24 Electrical system25 Vehicle-specific paint information26 General body repairs, interior27 General body repairs, exterior
Volkswagen Passat B8 (2014-2023)21 · Heating, air conditioning
21 · Heating & A/C

Removing and installing expansion valve, Passat

Make
Volkswagen
Model
Passat B8
Year
2014–2023
Section
Refrigerant circuit › Removing and installing expansion valve, Passat
Heating, air conditioningRemoving and installing expansion valve, Passat

Removing and installing expansion valve, Passat

The expansion valve atomises instreaming refrigerant. It regulates the flow so that the vapour, depending on heat transport, becomes a gas only upon reaching the outlet of the evaporator.

Special tools and workshop equipment requiredTorque wrench V.A.G 1331/
W00-11166
Engine bung set VAS 6122
W00-11228
Air conditioner service station

Removing

Vehicles with 176 kW TDI bi-turbo engine

Remove engine Rep. gr.10Removing and installing engine.

Vehicles with TDI engine

Remove charge air cooler connecting pipe Rep. gr.21Charge air system; Assembly overview - charge air system.

Continuation for all vehicles

A87-11328

Unscrew nuts (1) and (3).

Fold the heat shield (2) as far forwards as possible.

CAUTIONRisk of freezing injury caused by escaping pressurised refrigerant.There is a risk of injury to the skin and parts of the body due to freezing.Wear protective gloves.Wear eye protection.Extract refrigerant, and open the refrigerant circuit immediately afterwards.If more than 10 minutes passed since the refrigerant has been extracted, do not open the refrigerant circuit prior to extracting refrigerant anew. Due to re-evaporation, pressure will be built up in the refrigerant circuit.

Unscrew nuts (1) and (3) of refrigerant lines with internal heat exchanger (5).

A87-11414

Remove bolt (7).

Detach refrigerant line with internal heat exchanger (5) from expansion valve and remove.

Remove bolts (1) and (3).

A87-11400

Pull expansion valve (4) out of heat insulation (2).

Seal off open lines and connections with clean plugs from engine bung set VAS 6122.

Installing

Installation is carried out in reverse order of removal. Note the following:

A87-11401

Fit seals (1) and (4) on connecting pipes (2) and (3).

Check refrigerant lines for dirt and damage.

Push refrigerant lines (2) into expansion valve by hand.

A87-11329

Screw bolt (1) in by hand.

Tighten bolt (1).

Note

  • If heat insulation (2) is missing or improperly installed, it may lead to reduced performance of the air conditioning system (due to changes in the set mapped values through heat radiation).
A87-11400

Specified torques

  • Chapter“System overview - refrigerant circuit”
  • Assembly overview - charge air system Rep. gr.21Charge air system; Assembly overview - charge air system
  • Removing and installing engine Rep. gr.10Removing and installing engine

Parts & tools for this job For 2014 Volkswagen Passat

As an Amazon Associate we earn from qualifying purchases.