Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)02 4-cyl. direct injection engine (1.8 l and 2.0 l, 4 V, EA 888 gen III, turbocharger, chain drive)03 Fuel supply system - Petrol engines04 Fuel supply system - Diesel engines05 4-cylinder common rail engine (1.6 l and 2.0 l, 4V, turbocharger, EA288)06 4-cylinder common rail engine (2.0 l, 4V, bi-turbo, EA288)07 Fuel supply system - petrol engines, hybrid vehicles08 4-cylinder injection engine (hybrid)09 Propshaft and rear final drive10 6-speed dual clutch gearbox 0D911 7-speed dual clutch gearbox 0CW12 6-speed dual clutch gearbox 0DD, hybrid vehicles13 6-speed manual gearbox 0AJ14 6-speed manual gearbox 02S15 6-speed manual gearbox 02Q, 0BB and 0FB16 7-speed dual clutch gearbox 0DL17 Brake system18 Running gear, axles, steering19 Wheels and Tyres Guide20 Brake system (hybrid)21 Heating, air conditioning22 Heating and air conditioning: Auxiliary heater23 Electrical: Communication24 Electrical system25 Vehicle-specific paint information26 General body repairs, interior27 General body repairs, exterior
Volkswagen Passat B8 (2014-2023)21 · Heating, air conditioning
21 · Heating & A/C

Removing and installing expansion valve, Passat GTE

Make
Volkswagen
Model
Passat B8
Year
2014–2023
Section
Refrigerant circuit › Removing and installing expansion valve, Passat GTE
Heating, air conditioningRemoving and installing expansion valve, Passat GTE

Removing and installing expansion valve, Passat GTE

Special tools and workshop equipment requiredTorque wrench V.A.G 1331/ (5…50 Nm)
W00-11166
Engine bung set VAS 6122
W00-11228
Air conditioner service station

Function

  • The expansion valve atomises incoming refrigerant and regulates the flow so that, depending on the heat transport, the vapour does not become a gas until it reaches the outlet of the evaporator.

Removing

Observe safety precautions Chapter“Safety precautions when working on air conditioning systems”.

Comply with notes Chapter“Working on refrigerant circuit”.

Observe safety precautions when working on the high-voltage system Chapter“Safety precautions when working on high-voltage system”.

Observe safety precautions when working in the vicinity of high-voltage components Chapter“Safety precautions when working in vicinity of high-voltage components”.

Observe the risk category of the high-voltage system Rep. gr.00Risk category of the high-voltage system.

Note

  • The refrigerant must be extracted using the air conditioner service station.
  • The previously used air conditioner service stations can still be used ⇒ Volkswagen Workshop Equipment catalogue.
  • To prevent the intrusion of moisture, all components of the refrigerant circuit which have been opened must be sealed with suitable plugs.
  • The connecting pipe from charge air cooler must be removed on some vehicles Rep. gr.21Charge air system; Assembly overview - charge air system.

Remove air pipes in front of expansion valve.

Detach bracket (A) for coolant valve for high-voltage battery N688 from plenum chamber bulkhead.

A87-11596

Unscrew speed nuts (1) and (3).

A87-11328

Fold the heat shield (2) as far forwards as possible (arrow).

CAUTIONEscaping pressurised refrigerant can cause freezing.There is a risk of injury to the skin and parts of the body due to freezing.Wear protective gloves.Wear eye protection.Extract refrigerant, and open the refrigerant circuit immediately afterwards.If more than 10 minutes have passed since the refrigerant was extracted, repeat the extraction process before opening the refrigerant circuit. Continued evaporation will cause pressure to develop again in the refrigerant circuit.

Extract refrigerant.

Remove nuts (1) and (3) from the refrigerant line with the internal heat exchanger

A87-11414

Note

  • This illustration shows the configuration for vehicles without high-voltage system.
  • On vehicles with high-voltage system, the refrigerant shut-off valve for heater and air conditioner unit N541 is installed in the refrigerant line - high-pressure side Chapter“Removing and installing refrigerant shut-off valve for heater and air conditioner unit N541”.
  • If necessary disconnect connector for N541.

Remove bolt (7).

Pull refrigerant line with internal heat exchanger off expansion valve.

Unscrew bolts (1) and (3).

A87-11400

Carefully pull expansion valve (4) out of heat insulation (2).

Seal off open lines and connections with clean plugs from engine bung set VAS 6122.

Installing

Installation is carried out in the reverse order. When installing, note the following:

A87-11401

Renew seals. For versions, refer to Electronic Parts Catalogue.

Fit seals (1) and (4) on connecting pipes (2) and (3) leading to evaporator.

Press refrigerant pipe (2) by hand into expansion valve.

A87-11329

Start bolt (1) by hand and only then tighten to specified torque.

Note

  • There are different versions of the expansion valve (identical housing, but different control characteristic). For correct version refer to Electronic Parts Catalogue.
  • Check refrigerant pipes leading to evaporator for dirt and damage.
  • Moisten seals with refrigerant oil before installing.
  • Ensure seals are properly seated on connecting pipes of evaporator.
  • If heat insulation (2) is missing or improperly installed, it may lead to reduced performance of the air conditioning system (due to changes in the set mapped values through heat radiation).
A87-11400

Specified torques

  • Chapter“System overview - refrigerant circuit”

Parts & tools for this job For 2014 Volkswagen Passat

As an Amazon Associate we earn from qualifying purchases.