Workshop Manuals Factory service & repair Volkswagen
01 6-cylinder injection engine (4-valve), mechanics02 4-cylinder injection engine (5-valve), mechanics03 4-cylinder diesel engine (1.9 l engine)04 4-cylinder diesel engine (2.0 l engine, 2 valve)05 6-speed manual gearbox 02N, all-wheel drive06 6-speed manual gearbox 02N07 4-speed automatic gearbox 099, four-wheel drive08 Automatic gearbox 099 - 4-speed09 5-speed automatic gearbox 09B10 Wheels and Tyres Guide - Standard11 Running gear, axles, steering - front and four-wheel drive12 Brake systems13 Supplementary heating14 Heating, air conditioning15 Electrical system self-diagnosis16 Electrical system17 Electrical: Communication18 Body self-diagnosis19 General body repairs, interior20 General body repairs, exterior
Volkswagen Sharan Mk1 (1995-2010)03 · 4-cylinder diesel engine (1.9 l engine)
03 · Engine

Installing

Make
Volkswagen
Model
Sharan Mk1
Year
1995–2010
Section
Cylinder head › Installing
4-cylinder diesel engine (1.9 l engine)Installing

Installing

Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:

  • Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant and refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
  • Ensure that there is sufficient clearance to all moving or hot components.

Note

  • Always renew cylinder head bolts.
  • If repairing, carefully remove any remaining gasket material from the cylinder block and cylinder head. Ensure that no long scores or scratches are made on the surfaces. When using abrasive paper do not use a grade less than 100.
  • Do not remove new cylinder head gasket from packaging until it is ready to be fitted.
  • Handle gasket very carefully. Damage to the silicone layer or the indented area will lead to leaks.
  • Carefully remove remains of emery and abrasives.

Turn crankshaft to TDC marking before fitting cylinder head.

Turn crankshaft against engine direction of rotation until all pistons are about the same distance below TDC.

Position cylinder head gasket.

Fit cylinder head and hand tighten all cylinder head bolts (Qty.

Tighten cylinder head in four stages in sequence shown as follows:

V15-0738

1. Tighten initially with torque wrench: stage I = 40 Nm; stage II = 60 Nm

2. Turn further with rigid spanner: stage III = 1/4 turn (90°), stage IV = 1/4 turn (90°)

Note

  • After repair work it is not necessary to retighten the cylinder head bolts.

After tightening cylinder head, turn camshaft so that cams for No. 1 cylinder point equally upwards. Turn crankshaft, in engine direction of rotation, to TDC marking before fitting toothed belt → Chapter.

A15-0530

Install cylinder head cover → Chapter.

Install camshaft pulley and hub → Chapter.

Secure spindle (B) to lifting eye and slightly lift engine until the spindle (B) is relieved.

N15-0305

Remove spindle (A).

Remove retainer T10014.

Fit engine support (1) so that the boss cast on the engine bracket faces towards the locking lug of the rear toothed belt guard (arrows).

N15-0306

Tighten securing bolt (2) hand tight.

Fit engine support (1) to cylinder block. Specified torque for M8: 30 Nm; specified torque for M10: 45 Nm

N15-0307

Tighten securing bolt (2). Specified torque: 45 Nm.

Install toothed belt and adjust valve timing → Chapter.

Install poly V-belt → Chapter.

Carry out road test and read fault memories → Chapter.

Observe applicable safety precautions during road test → Chapter.

Parts & tools for this job For 1995 Volkswagen Sharan

As an Amazon Associate we earn from qualifying purchases.