Workshop Manuals Factory service & repair Volkswagen
01 6-cylinder injection engine (4-valve), mechanics02 4-cylinder injection engine (5-valve), mechanics03 4-cylinder diesel engine (1.9 l engine)04 4-cylinder diesel engine (2.0 l engine, 2 valve)05 6-speed manual gearbox 02N, all-wheel drive06 6-speed manual gearbox 02N07 4-speed automatic gearbox 099, four-wheel drive08 Automatic gearbox 099 - 4-speed09 5-speed automatic gearbox 09B10 Wheels and Tyres Guide - Standard11 Running gear, axles, steering - front and four-wheel drive12 Brake systems13 Supplementary heating14 Heating, air conditioning15 Electrical system self-diagnosis16 Electrical system17 Electrical: Communication18 Body self-diagnosis19 General body repairs, interior20 General body repairs, exterior
Volkswagen Sharan Mk1 (1995-2010)03 · 4-cylinder diesel engine (1.9 l engine)
03 · Engine

Removing

Make
Volkswagen
Model
Sharan Mk1
Year
1995–2010
Section
Cylinder head › Removing
4-cylinder diesel engine (1.9 l engine)Removing

Removing

Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:

  • Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant and refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
  • Ensure that there is sufficient clearance to all moving or hot components.

With ignition switched off, disconnect earth strap from battery.

Remove engine cover.

Before removing cylinder head extract fuel using hand vacuum pump V.A.G 1390 and fluid receptacle V.A.G 1390/1 on the tandem pump → Chapter.

Remove toothed belt → Chapter.

Remove hub for camshaft pulley → Chapter.

Remove front exhaust pipe from turbocharger → Chapter.

Drain coolant → Chapter.

Pull off or disconnect all other electrical connections as necessary from cylinder head and lay to side.

Separate all connecting, coolant and vacuum hoses from cylinder head.

Remove engine support (1) and in place screw retainer T10014 into cylinder block.

N15-0276

Tighten securing bolt (2) of retainer T10014 to 20 Nm.

Secure the spindle (A) to retainer T10014 and slightly lift engine until the spindle (B) is relieved.

N15-0305

Remove spindle (B).

Remove cylinder head cover → Chapter.

Loosen cylinder head bolts in the sequence given starting at the outside and working inwards and then remove completely.

N15-0026

Carefully remove cylinder head.

Place clean cloths in cylinders so that no dirt or emery cloth particles can get in between cylinder wall and piston.

Also prevent dirt and emery cloth particles from getting into coolant.

Now carefully clean sealing surfaces of cylinder head and cylinder block. When doing this, ensure that surfaces are not scored or scratched (if abrasive paper is used, grade must not be less than 100).

Parts & tools for this job For 1995 Volkswagen Sharan

As an Amazon Associate we earn from qualifying purchases.