Assembly overview - cylinder bank 2
- Make
- Volkswagen
- Model
- Touareg Mk1
- Year
- 2002–2010
- Section
- Cylinder heads › Assembly overview - cylinder bank 2
‹ Prev Assembly overview - cylinder bank 1Next › Removing and installing cylinder head cover (cylinder banks 1 and 2)
12-cylinder injection engineAssembly overview - cylinder bank 2
Assembly overview - cylinder bank 2
Note
- Cylinder bank 2 is located on left side when looking forwards.
- Assembly overview - intake manifold → Chapter.
- Assembly overview - parts of chain drive → Chapter.

- Cylinder head cover
Removing and installing → Chapter, Removing and installing cylinder head cover (cylinder banks 1 and 2).
Renew if damaged. - O-ring
Renew if damaged.
Lubricate before installing. - Oil filler neck
Coat sealing surfaces with sealant AMV 188 001 02. - 10 Nm
- Cap
Renew seal if damaged. - 10 Nm
With spacer sleeve and seal.
Renew seal if damaged.
Observe sequence when tightening → Chapter, Removing and installing cylinder head cover (cylinder banks 1 and 2). - 8 Nm
- Bracket
For secondary air inlet valve. - Seal
For inlet camshaft control valve 2 N208Item and exhaust camshaft control valve 2 N319Item
Renew if damaged or leaking.
Installing → Fig.. - Retainer
For wiring harness. - Cylinder head cover gasket
Renew if damaged or leaking.
Note installation position. - 10 Nm
Follow installation instructions and sequence when loosening and tightening → Chapter, Adjusting timing. - Cover
Can be removed and installed with cylinder head fitted.
Without O-ring for sealing oil gallery.
Installing → Chapter Adjusting valve timing. - Hall sender
Item
Before removing, mark connector belonging to component - Cylinder head gasket
Renew → Chapter, Removing and installing cylinder head (cylinder banks 1 and 2).
After renewing, renew entire coolant. - Lifting eye
- 23 Nm
- 60 Nm + 1/4 turn (90°) further
Renew.
Contact surface of sender wheel must be dry around bolt head when installed.
To remove and install, counterhold using 32 mm open-end spanner on camshaft → Chapter Removing and installing camshafts. - Exhaust camshaft adjuster
Identification: B2.
Rotate engine only with camshaft adjuster installed.
Installing → Chapter Adjusting valve timing. - Camshaft timing chain
Before removing, mark direction of rotation (installation position).
Installing → Chapter Adjusting valve timing. - Guide rail
For camshaft timing chain Item
Clipped into timing housing. - Exhaust camshaft control valve 2 N319
For exhaust camshaft.
Before removing, mark connector belonging to component - Inlet camshaft control valve 2 N208
For inlet camshaft.
Before removing, mark connector belonging to component - Inlet camshaft adjuster
Identification: B2.
Rotate engine only with camshaft adjuster installed.
Installing → Chapter Adjusting valve timing. - Cylinder head
Check for distortion → Fig..
Removing and installing → Chapter, Removing and installing cylinder head (cylinder banks 1 and 2).
After renewing, renew entire coolant. - Cylinder head bolt
Renew.
Refer to assembly instructions and sequence when loosening and tightening → Chapter Removing and installing cylinder head (cylinder banks 1 and 2).
‹ Prev Assembly overview - cylinder bank 1Next › Removing and installing cylinder head cover (cylinder banks 1 and 2)
Parts & tools for this job For 2002 Volkswagen Touareg
- PARTEngine gasket setSearch: Volkswagen Touareg 2002 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.