Workshop Manuals Factory service & repair Volkswagen
01 6-cylinder injection engine02 8-cylinder injection engine03 6-cylinder diesel engine (3.0 l engine, common rail)04 12-cylinder injection engine05 6-cylinder injection engine (direct injection)06 8-cylinder injection engine (direct injection)07 10-cylinder diesel engine Volkswagen R GmbH08 5-cylinder diesel engine09 10-cylinder diesel engine10 Automatic gearbox 09D Volkswagen R GmbH11 Automatic gearbox 09D12 6-speed manual gearbox 08D13 Transfer box and final drive14 Wheels and Tyres Guide - Standard15 Running gear, axles, steering16 Brake systems17 Supplementary heating18 Heating, air conditioning19 Electrical system20 Electrical: Communication21 General body repairs, interior22 General body repairs, exterior
Volkswagen Touareg Mk1 (2002-2010)04 · 12-cylinder injection engine
04 · Engine

Installing

Make
Volkswagen
Model
Touareg Mk1
Year
2002–2010
Section
Cylinder heads › Installing
12-cylinder injection engineInstalling

Installing

Carefully remove metal particles, emery residue and cloths.

Ensure that marking (1) is flush with cylinder block joint (2) and locking bolt 3242 is still screwed in.

N13-0740

Cylinder bank 1.

Note

  • Do not remove new cylinder head gasket from its packing until immediately before installing.
  • Handle new gasket with extreme care. Damage will cause leakage.

Fit new cylinder head gasket.

Ensure that dowel sleeves are inserted into cylinder block holes 19 and 14, and that cylinder head gasket is located.

N15-0627

Cylinder bank 2.

Fit new cylinder head gasket.

Ensure that dowel sleeves are inserted into cylinder block holes 10 and 21, and that cylinder head gasket is located.

N15-0628

Cylinder banks 1 and 2

Before installing, position camshafts in relevant cylinder head to TDC for for No. 1 cylinder

Insert camshaft bar T10068 A into both shaft grooves.

N15-10067

Fit cylinder head, screw in new cylinder head bolts and tighten hand tight.

Note

  • Only remove the camshaft bar T10068 A from the shaft grooves when the cylinder head bolts are being tightened, and make sure that the camshafts are not being turned while doing so.
  • The longer cylinder head bolts must be inserted in the centre holes of cylinder head.

Cylinder bank 1.

Tighten cylinder head bolts in tightening sequence as follows:

N15-0627

Pre-tighten all bolts to 30 Nm.

Then tighten all bolts to 50 Nm.

Then tighten all bolts 1/4 turn (90°) further using a rigid wrench.

Then tighten all bolts again 1/4 turn (90°) further.

Now, insert camshaft bar T10068 A into both shaft grooves again.

Cylinder bank 2.

Tighten cylinder head bolts in tightening sequence as follows:

N15-0628

Pre-tighten all bolts to 30 Nm.

Then tighten all bolts to 50 Nm.

Then tighten all bolts 1/4 turn (90°) further using a rigid wrench.

Then tighten all bolts again 1/4 turn (90°) further.

Insert camshaft bar T10068 A into both shaft grooves again.

Cylinder banks 1 and 2

Note

  • It is not necessary to retighten cylinder head bolts after repairs.

Make sure that all guide rails are installed before fitting the camshaft timing chains.

Further assembly is basically the reverse of the dismantling sequence.

Note

  • When removing or installing the cylinder head of a cylinder bank of a previously used engine, there is no need to observe the position of camshaft timing chain copper links, since the proper position cannot be set before final assembly of the chains.
  • After adjusting valve timing, place both camshaft bars T10068 A (with crankshaft positioned at TDC No. 1 cylinder) into both shaft grooves of camshafts for cylinder banks 1 and 2.

Adjusting valve timing → Chapter.

Now, unscrew locking bolt 3242.

N13-0732

Install screw plug at bottom left of cylinder block.

Parts & tools for this job For 2002 Volkswagen Touareg

As an Amazon Associate we earn from qualifying purchases.