Heat exchanger - remove and install
- Make
- Volkswagen
- Model
- Up! Brazil-market up!
- Year
- 2014–2021
- Section
- Plenum chamber › Heat exchanger - remove and install
Heat exchanger - remove and install
Special tools and workshop equipment requiredVAS 6100 hoist oil drip tray VAS 6208


Disconnect the earth wire of the Battery AElectrical devicesRep. gr.27Starter motor, alternator, battery.
Warning The cooling system is under pressure while the engine is hot!
Risk of burns by hot steam and hot coolant.
Reduce overpressure, covering the coolant compensation reservoir cover with a cloth and opening it carefully.
Remove the air filter EngineRep. gr.24Supply system - fuel injection-
Identify the cooling system hoses in the engine compartment and seal them using the Clamps (diameter 40 mm) 3093 and remove the heat exchanger.

Install the hoses (A) and (B) in both heat exchanger connections.

Hold a recipient (C) underneath the lower connection hose (B) .
Use a compressed air gun (D) to drain the coolant from the heat exchanger through the hose (A) into the recipient (C).
Remove plenum chamber → Chapter.
Disassemble the plenum chamber → Chapter.
Remove the heat exchanger.
Installation is performed in reverse sequence to the removal, considering the following:
Installation position of coolant hoses and sealing between the heat exchanger and the front plenum chamber wall.
Sealing between the heat exchanger and the front part plenum chamber wall.
Note
- If the heat exchanger is replaced, the coolant must also be replaced.
Fill the coolant system after installing EngineRep. gr.19Cooling system.
Parts & tools for this job For 2014 Volkswagen Up!
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Volkswagen Up! 2014 cabin filter
As an Amazon Associate we earn from qualifying purchases.