volvo Workshop Repair Guides

Volvo Workshop Service and Repair Manuals

Protective Film, Installing|Page 11407 > < Protective Film, Installing|Page 11405
Page 22
background image

 Spray the 1st coat so that it covers the area well with a good flow. Always spray at right angles to the surface and start at the edges.

Wait at least 3 minutes before the required "Flash-off" 

Spray the second and third coats with a good flow

The color coat should reach a thickness of 35-40 Âµm (corresponding to 3 spray strokes).

Dry the color coat

Drying with a heat lamp or hot-air gun

Applies especially to smaller repairs.

 Allow the car to dry at room temperature (20°C) for at least 12 hours after painting.

Solid primer + varnish

When touching up cars painted with a solid primer and varnish, the same type of paint  must always be used. This is to prevent color and finish
differences.

Protective Film, Installing|Page 11407 > < Protective Film, Installing|Page 11405