Note t
| Always replace the seals and gaskets during assembly work. |
t
| Always replace self-locking nuts. |
Installation is performed in the reverse order, pay attention to the following points: |
–
| Check whether the 2 dowel sleeves for centering the gearbox are present in the cylinder block, insert if necessary. |
–
| If necessary check the centering of the clutch disc. |
–
| Inspect clutch release bearing for wear, replace if necessary. |
–
| Grease the drive shaft serration with grease -G 000 100-. |
–
| When installing engine/gearbox unit, ensure adequate clearance to other components. |
–
| Align the engine and gearbox so that they are tension-free. |
For vehicles with air conditioning |
Continued for all vehicles |
–
| Install the front exhaust pipe and the exhaust system so that they are not under tension → Chapter. |
Note The drained off coolant must only be then re-used if the cylinder block, cylinder head, radiator or heat exchanger were not replaced. |
–
| Check oil level before starting the engine. |
–
| Adapt the engine control unit to the throttle valve control unit -J338- → Vehicle diagnostic tester, if the engine control unit or the throttle valve was replaced. |
|
|
|