Procedure
- Make
- Audi
- Model
- Q5 Mk1
- Year
- 2008–2017
- Section
- Gearbox control system › Procedure
Procedure
Drill out original joint using spot weld breaker.
Cut through joint with A-pillar using body saw.

Separate top joint to longitudinal member for wheel housing using compact angle grinder.
Drill off original joint to A-pillar reinforcement using spot weld breaker.
Cut through joint with A-pillar using body saw.

Remove remaining material using compact angle grinder.

- Intermediate piece
Transfer separating cuts to new parts (1) and (2) and cut to size using body saw.
Drill holes for SG plug weld seam, 8 mm ∅ using drill.

Note
- Due to the different types of steel and panel thicknesses employed, one of the resistance spot welding units listed in this manual and approved by Audi must be used to ensure correct results when spot welding.
Match up new parts and fix in position.
Check fit relative to adjacent parts.
Weld in intermediate piece using shielded arc welding equipment: SG plug weld seam and SG continuous seam (staggered - with gaps).

Remake original joint using resistance spot welder VAS 6239 A: RP spot weld seam.
Weld in intermediate piece using shielded arc welding equipment: SG plug weld seam and SG stepped seam (stitch weld).

Parts & tools for this job For 2008 Audi Q5
- PARTTransmission filter kitSearch: Audi Q5 2008 transmission filter kit
- FLUIDAutomatic transmission fluidSearch: Audi automatic transmission fluid
- TOOLFluid transfer pumpSearch: fluid transfer pump
As an Amazon Associate we earn from qualifying purchases.