Procedure
- Make
- Audi
- Model
- Q5 Mk1
- Year
- 2008–2017
- Section
- Gearbox control system › Procedure
Automatic gearbox 0B6, four-wheel driveProcedure
Procedure
Outer A-pillar already removed ChapterIntermediate piece already removed → ChapterNote
- The RP weld seams produced at the factory are spot welded/bonded joints. These are replaced with shielded arc-welded (SG) and spot-welded (RP) seams.
Drill out original joint using spot weld breaker.
Pull out A-pillar reinforcement downwards.

Remove remaining material using compact angle grinder.

- A-pillar reinforcement
Use spot weld breaker to drill off original joint between A-pillar reinforcement and upper A-pillar reinforcement.
Drill holes for SG plug weld seam, 8 mm ∅ using drill.

Note
- Due to the different types of steel and panel thicknesses employed, one of the resistance spot welding units listed in this manual and approved by Audi must be used to ensure correct results when spot welding.
Weld in A-pillar reinforcement: RP spot weld seam.
Weld A-pillar reinforcement: SG plug weld seam.

Parts & tools for this job For 2008 Audi Q5
- PARTTransmission filter kitSearch: Audi Q5 2008 transmission filter kit
- FLUIDAutomatic transmission fluidSearch: Audi automatic transmission fluid
- TOOLFluid transfer pumpSearch: fluid transfer pump